Stadium Drive Elementary

Stadium Drive Elementary

Plans

The site will also have redesigned parking for improved traffic flow, including a new bus loop.

The construction is expected to begin in the spring of 2021 and conclude in the fall of 2021.

Process

The design team discussed the two phases of the project, which will be a year apart in the construction process.

Initially, the secure entrance renovation was the focus, as well as the internal design of the main office.

Among the items discussed: the reception area’s visible line of sight to health room and outside at the entrance, the size of the conference room and the logistics of the office, including where visitors will sit in the reception area. The second-floor area above the renovated office was also re-examined with the breakout rooms.

The flow of the staircases was also a conversation topic.

The team viewed multiple outdoor renderings of the office space with different roof and window designs.

The second phase on the building was discussed, involving the STEM room, the large group area nearby and the new media productions space. (May 6 Update)